Model: YHZS25
Rated Productivity(m³/h): 25
Concrete Mixer: JS500
Aggregate Bin Volume(m³): 3.2
Total power(KW): 50Kw
Gross weight(T): 12
Discharging height(M): 2.8 m
Mixer Discharging capacity(L): 500
Model: YHZS35
Rated Productivity(m³/h): 55
Concrete Mixer: JS750
Aggregate Bin Volume(m³): 7.3
Total power(KW): 64Kw
Gross weight(T): 16
Discharging height(M): 2.8 m
Mixer Discharging capacity(L): 750
Model: YHZS50
Rated Productivity(m³/h): 50
Concrete Mixer: JS1000
Aggregate Bin Volume(m³): 3.2
Total power(KW): 85Kw
Gross weight(T): 20
Discharging height(M): 2.8 m
Mixer Discharging capacity(L): 1000
2016-05-25 · Plant and Equipment Loading / Unloading Work Method Statement This document is uncontrolled when printed Version Number: 5.0 Date Reviewed: 19 April 2016 Page 1 of 4 Plant and Equipment – Loading / Unloading Warning You cannot undertake this activity in the rail corridor unless you have completed a pre work brief and work site protection plan.
- Explaining the content of the method statement and risk assessments to all operatives. - Explaining the content of the Traffic Management Plan to all operatives. - Ensuring that all persons comply with the safe systems of work laid down by Trenchco Ltd in this method statement and associated risk assessments.
The Tomato Plant Company Ltd Method Statement and Risk Assessment – Loads requiring lifting. Generic method statement & risk assessment for the removal of portable accommodation units and/or shipping containers and/or other loads requiring lifting.
pins. Appropriate load securing. Tilt trays with airbags must be deflated prior to 2M Falling, uncontrolled or unexpected movement of plant or load Trapped under or between plant and materials/structure Contact with moving parts during testing, inspection, maintenance, cleaning or repair Being thrown off Tipping or rolling over
2016-09-06 · the load. Make sure to roll tarps forward and not backwards. • While engaged in loading and unloading operations, the use of cell phones and any other mobile devices should be prohibited. These devices can distract employees in the danger zone, putting everyone at risk.
• Review the Risk Assessment specific to the activity involved prior to carrying out the work. o Excavation, Concrete & Structural Work Risk Assessments are attached. • Providing suitable and safe access to and from the work place including the work area.
new honda gx35 concrete cement magic screed engine mini 4 high production concrete block making machine for sale from aimix hzs50 d50m3/h stational long working time kunding high efficiency concrete crushert
the ideal cement and sand ratio for wall plastering podium structures dali china resources how much money do i need to own precast concrete plant
the risk assessment has not revealed (see section 3 Risk assessment) any unacceptable risks or incompatibility of the product with the bag material. Flexitank suppliers should provide a manual including the process description of the container selection, flexibag fitting, container lining, bulkhead installation, loading, labeling and unloading.
new honda gx35 concrete cement magic screed engine mini 4 prota structure modelling reinforced concrete members for a fixed robo sand make machine price plastic cement mixer
Plant Hazard Identification and Risk Assessment WHS 041 PRA 007 Issue Date: 04/04/2018 Review Date: 04/04/2019 Version No: 5.0 5 of 18 Crushing - Yes No Can anyone be crushed due to falling, uncontrolled or unexpected movement of plant or its load, lack of capacity to slow, stop or immobilise the plant, tipping or
Handling liquid bulk materials can pose substantial hazards. Indeed, in 2008 when the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration (PHMSA) proposed recommended best practices for loading and unloading operations [1], it noted “roughly one-quarter to one-half of all serious hazardous materials incidents may be associated with loading and ...
RA No. Risk Assessment Description Page No. A001 Abrasive Wheels (Safe use) - New 2 & 3 A006 Asbestos Containing Material 4 B001 Bitumen Emulsion Spraying (Tack coat) 5 B002 Bitumen Works (Hot) 6 B003 Tipping / Unloading of Bulk Loads 7 B004 Breakers (Heavy Duty 110v) 8 B005 Building Materials (Use of) 9 C006 Confined Spaces 10
PLANT RISK ASSESSMENT WORKSHEET (PRA) Plant Risk Assessment Form Rev1 N Moit & Sons (NSW) Pty Ltd Page 10 of 19 Potential Hazards Hazard Describe Hazard Controls Currently In Place on Plant Current Risk Level Complete: New or Additional Controls Required on Plant Final Risk Level New or Additional Controls Action By: (Name and Date) Action
4. Don’t deal with on-bus problems when unloading and loading. ( Loading and unloading requires all your concentration. Don’t take your eyes off what is happening outside the bus. ( If there is a behavior problem on the bus, wait until the students unloading are safely off the bus and have moved away.
Risk Assessments are comprehensive, and are about 4-7 pages long, with space for your company details and logo. The appropriate Hazards and Control Procedures for a typical Job are included in the Risk Assessment you are going to purchase. We include Telephone support with all of our documents, call us on the number above for assistance.
This document is a guide on good practices for the loading and unloading of cryogenic liquid in road tankers, and describes the functions and responsibilities of both the production site and bulk logistics organisation in this activity. 2 Scope This document specifically covers the loading and unloading operations for liquid oxygen, nitrogen
rwet mix concrete m sand manufacturing plant in rajasthan
Hazard Identification and Risk Assessment is a method, by which, we try to identify the main hazardous substance, and then try to reduce the effect of hazard. As we spotted the main risk during filling and transportation of Petroleum Products, so with the help of Risk Assessment, reduce the main hazards.
Guide on Manual Handling Risk Management in Transport and Storage THE BUSINESS CASE FOR MANAGING MANUAL HANDLING IN THE TRANSPORT AND STORAGE SECTOR The 2012 Health and Safety Authority figures for non-fatal injuries in the transport and storage sector
Managing injury risks when securing loads on trucks – non-peer reviewed paper 2 Other load restraining equipment, such as truck gates, side-curtains and other tie-down equipment is also commonly used. Choice of equipment depends on the type of load, type of truck and the requirements under the Load Restraint Guide performance standard (National
The loading / unloading area design must be subject to a full risk assessment The loading / unloading risk assessment must consider the following attributes of the loading point: Side slope / Long slope. When loading areas are not flat / level, load stability may be compromised dependent on the nature of the load. This is
briggs and stratton horizontal engines dhb series asphalt drum mix plant for sale m3 h foam small wet portable beach cleaning machines
UWA Plant and Equipment Safety Procedures 3 of 20 These are practices developed during the risk assessment to alert employees and operators of the hazards associated with the plant. Standard Operating Procedures do not take the place of training or operation manuals. Plant exemptions
list of common hazards/risk factors associated with loading and unloading pipe/cylindrical stock. A sampling of hazards/risk factors to be considered are: • Weight of the load lifted. • Range of the lift. • Location of the pipe. • Size and shape of the pipe. • Number and frequency of lifts performed.
3 5 cu ft concrete mixer mobile concrete batching plant ready the expert in construction and renovation products dry mixed texture plus, biaxial
Hazard Analysis - FEATURE: CONCRETE, CAST-IN-PLACE 27 Aug 2010 RMS Training Contract Flagstaff Project Office W912PP-07-C-0010 NA Principal Steps Potential Safety/Health Hazards Recommended Controls Concrete Testing Chemical burn Rubber gloves and boots are required. Eye Hazard Safety glasses w/side shields and/or goggles. Face shield as required.
Step 4 – Perform Risk Assessment •Next use the information obtained in the brainstorming activity and floor assessment as a foundation to perform a risk assessment •Include known controls and risk mitigations •Cross functional team – Microbiologists, Manufacturing, Engineers, Quality, Facilities
1.0 RISK ASSESSMENT AND HAZARD MANAGEMENT Hazard analysis involves the identification and quantification of the various hazards (unsafe condition) that exist in the plant. On the other hand, risk analysis deals with the identification and quantification of the risk, the plant equipment and Personnel are
Model |
Belt Type |
||
YHZS-25 |
YHZS-35 |
YHZS-50 |
|
Theoretical Productivity (m³/h) |
25 |
35 |
50 |
Mixer Model (Mixer Output L) |
JS500 |
JS750 |
JS1000 |
Mixer Power (kW) |
18.5 |
30 |
2×18.5 |
Mixing Cycle Period (s) |
67 |
72 |
72 |
Rated Input Volume (Model of Batching Machine L) |
800 |
1200 |
1600 |
Max.Aggregate Size (mm) |
Φ60 |
Φ60 |
Φ60 |
Standard Aggregate Bin Capacity (m³) |
2×3 |
2×5 |
3×5 |
Category of Aggregate |
2002/3/4 |
||
Powder Storage Silo (ton) (Optional) |
1×50 |
2×50 |
1×100 |
Max. Discharging Height (m) |
3.8 |
3.8 |
4.1 |
Weighing Range & Accuracy of Aggregate (kg) |
(300~1500)±2% |
(300~1500)±2% |
(300~3000)±2% |
Weighing Range & Accuracy of Cement (kg) |
(100~300)±1% |
(100~300)±1% |
(250~900)±1% |
Weighing Range & Accuracy of Water (kg) |
(60~150) |
(60~150) |
(80~300)±1% |
±1% |
±1% |
||
Weighing Range & Accuracy of Additive (kg) |
/ |
(8~20) |
(8~20) |
±1% |
±1% |
||
Overall Weight (ton) |
≈15 |
≈22 |
≈26 |
Installation Power (kW) |
≈61 |
≈73 |
≈92 |
Power Supply |
380V/220V/415/440V, 50/60HZ, 3Phase |
Contact us for more details about our trucks, solutions and services.